Date of meeting: 2026-07-22

Key speakers and topics

  • Dan Calamari (Energy): hurricane preparedness framework; incident command structure; annual and May storm drills; fast-tracked storm work; use of a third-party weather monitor and a predictive damage/resource database; inspections of critical distribution lines; coordination with neighboring utilities; emphasis on self-sufficiency and use of the PREDICT model; parallel restoration sequence (generation, transmission, distribution); prioritization of critical infrastructure; notes on customer-owned components requiring permits/inspections.
  • Harry Barton (Energy): resilience work details continuing Calamari’s themes; French Quarter and CBD projects; vault inspections (daily and end-to-end twice yearly); CBD underground system specifics; pumping systems to drain vaults; monitoring of pumps/transformers in new vaults; warning signs and water ingress monitoring.
  • Jessica Williams (Energy): customer communications strategy for storms; proactive pre-storm outreach for special-needs/critical facilities; pre-landfall contact windows (72/24 hours); storm-period communications (texts, email, outage map, social channels); damage assessment coordination with NOLA Ready; post-storm communications to critical customers; EOC staffing; generator readiness and cooling centers as critical customers.
  • Deanna Rodriguez (Entergy): focus on reliability after outages in French Quarter and North Kenilworth; introduced reliability teams for ongoing projects; reset of table.
  • Council Member McCarron: questions on DPS 7 pump operations, training pipeline, apprenticeship opportunities, operator experience, and any disciplinary actions from a July event. Sewage and Water Board responders provided details on training paths, staffing, retiree recall limits (17.5 hours), ongoing investigations (expected conclusion within ~1.5 weeks), catch-basin cleaning metrics, 3-1-1 data gaps, and immediate actions post-July 11 (claireborne/Lakeview). Discussion of real-time pump status alerts, better council/resident communications, potential staffing increases, and catch-basin screens/debris removal after road projects.

Decisions and actions (as stated) — Council resolution directing Energy & Operations (E&O) to

  • Include a feeder-level analysis using the original Appendix A methodology from Resolution R2373 and the adjusted methodology from the 2024 ESDRS filing.
  • Record and report portfolio and feeder-level SADI and SAFE, including major event days, in the annual compliance filing.
  • Resubmit the 2025 reliability report with this information and include it in future reliability reports.
  • Procedural note: the resolution is under consideration as a vehicle to address Entergy’s motion regarding an extension of the electric formula rate plan rider (i.e., a procedural schedule item).

Actions ongoing or initiated (clear from the material)

  • E&O to perform feeder-level analyses using both the original and proposed methodologies.
  • E&O to document and report SADI/SAFE metrics at feeder and portfolio levels, including major event days, in compliance filings.
  • E&O to resubmit the 2025 reliability report with the specified information and to include such information in future reliability reports.
  • Ongoing coordination with city entities (EOC, NOLA Ready) and continued public communications plans for French Quarter, North Kenilworth, and other projects.

Unresolved issues and open questions

  • Ongoing Sewage and Water Board investigation regarding DPS 7 pump operations: status, findings, and any resulting actions are not yet resolved; expected conclusion in ~1.5 weeks.

Training and staffing questions from the council

  • Training pipeline and apprenticeship opportunities for pump operators.
  • Average years of operator experience; any disciplinary actions from the July event.
  • Whether retirees can be recalled for emergencies; 17.5-hour recall limit and related policies.
  • Potential staffing increases for pump operations and real-time monitoring systems (e.g., real-time pump status alerts).

Catch basins

  • Data reporting gaps (cartograph system) and feasibility of catch-basin screens.
  • Debris removal/punch-list items after road projects.
  • Effectiveness of 3-1-1 reporting and potential improvements for timely maintenance and communication.
  • North Kenilworth project: status and timelines beyond the reported 94% completion, 30,000 feet of conduit installed, and 100 resources mobilized since July 12; implications for stakeholder engagement.

Communication and coordination enhancements

  • Best practices for real-time public updates during storms; sustaining dedicated hotlines post-project; extending outreach infrastructure (hotline, 3-1-1 updates) for ongoing resident questions.

Notes on scope and context

  • Focus on Energy’s hurricane preparedness and resilience efforts, including French Quarter and CBD vaults/underground systems, and the North Kenilworth project; plus customer engagement strategies during storms.
  • Also covers Sewage and Water Board pump infrastructure and staffing, with council follow-up on reliability reporting and rate rider procedural matters.

Transcript

Transcripts may contain automated transcription errors. Verify important details against the official recording.

Energy Hurricane Preparedness Presentation — Dan Calamari

Dan Calamari (Director of Reliability, Entergy New Orleans)

Dan Calamari opened Energy's hurricane preparedness briefing by outlining Energy's readiness framework. He stated that Energy trains its employees year-round for major events and follows an incident command structure to stay unified with other agencies. In May, Energy completed a formal storm drill with internal staff. Energy prepares for hurricanes, tornadoes, and winter storms and has to execute work in an expedited manner. The company is recognized year after year for its storm restoration performance. Weather is monitored through a third party that provides clarity on wind speeds and rainfall. Energy uses a special database to predict damages and determine required resources to energize the system in a given timeframe. Energy conducts inspections of critical distribution lines serving hospitals, police, fire stations, sewage/water board facilities, and other critical infrastructure, and will bring in additional resources from neighboring utilities as needed. Energy emphasizes being self-sustainable for hard-hit areas, ramping up line workers based on the PREDICT model, and assigning storm roles to all employees. The restoration process is described as a sequence run in parallel across different resources: generation must be available, transmission must carry power to communities, and substations and feeders distribute energy. Critical infrastructure is prioritized (hospitals, CSOs, police, etc.), followed by restoring the largest number of customers, with harder-hit areas potentially taking longer and sometimes requiring customer-side repairs. Some components are owned by customers (weather heads, weatherproof conduits, meters), which may require permits and inspections before power can be safely restored. Calamari then handed off to Harry Barton to discuss resilience work.

Energy Hurricane Preparedness Presentation — Jessica Williams

Jessica Williams (Senior Customer Service Manager, Entergy New Orleans)

Jessica Williams provided an overview of Energy’s customer communications strategy for storms. She highlighted proactive outreach during pre-storm season to identify customers with special needs and critical facilities, conduct property inspections, and check for weatherhead, low wires, or vegetation issues.72 hours before landfall, Energy can contact customers to review plans; 24 hours before landfall, Energy verifies communications are open; 24 hours after landfall, they provide damage assessment updates and restoration timelines. During storms, customers can receive information via text messages, email updates, and the storm site; they can also follow Energy on social media and use the outage map. Damage assessment timelines are coordinated with the city’s NOLA Ready site. Post-storm communications focus on notifying critical customers, including senior living facilities, and updating the council through district outage texts. Customer service will be embedded in the networks and Energy will staff the city’s EOC for storms. A generator readiness program notes that cooling centers will be identified and referenced as critical customers. The presentation ended with Williams offering to answer questions.

Entergy Reliability — North Kenilworth and French Quarter Resilience Update

Entergy New Orleans (Overview by Deanna Rodriguez; Detailed briefings by Dan Calamari, Jessica Williams, Courtney Nicholson, and Shronda Williams)

Deanna Rodriguez opened with remarks about Entergy's focus on reliability following repeated outages in the French Quarter and North Kenilworth, thanking customers for their patience and pledging better updates. She announced a reset of the table and introduced the reliability teams to share updates on the North Kenilworth and French Quarter projects. Dan Calamari provided a detailed timeline of the French Quarter and CBD improvements, noting that vault inspections occur daily and two end-to-end vault inspections occur each year. He explained that the underground system is unique to the CBD and requires specialized training; energy uses pumping systems to drain vaults after storms and has installed monitoring to track the functioning of pumps and transformers in new vaults. He answered questions about warning signs, explaining that vaults are inspected and monitored for water ingress. Jessica Williams discussed the customer engagement strategy for the French Quarter and North Kenilworth projects, including on-site coordination with hotels, real-time updates, and public communication channels. For North Kenilworth, Calamari outlined the end-to-end reliability improvements, including an extensive underground work, 30,000 feet of conduit installation, and 94% completion; 100 resources were mobilized since July 12. The team highlighted stakeholder engagement to provide context and manage outages and timelines.

North Kenilworth Customer Engagement and Outreach

Jessica Williams (Customer Service)

Jessica Williams described the North Kenilworth customer engagement plan, emphasizing boots-on-the-ground outreach and real-time updates for stakeholders. She noted that a dedicated hotline was created for residents to address concerns during the project, with the team monitoring calls and dispatching representatives as needed. A North Kenilworth project website was launched to provide updates, timelines, and location details. Text and email updates were distributed to inform residents of progress and property access needs. Williams highlighted collaboration with the city to ensure EOC support and the inclusion of nursing homes in the critical customer list. After the project, the hotline would remain active for a period to address lingering questions, and 3-1-1 updates would be used for ongoing communication.

Sewage and Water Board — Hurricane Preparedness and After-Action Discussion

Sewage and Water Board

Council Member McCarron opened with questions about DPS 7 pump operations, training, and whether the operator involved is still on staff. He asked about the training pipeline and apprenticeship opportunities, the average years of operator experience, and any disciplinary actions from the July event. Sewage and Water Board representatives described the training path from entry-level to operator, the presence of four primary operators per manned station, and the ongoing investigation with an expected conclusion within a week and a half. He also queried about whether retirees could be recalled for staffing during emergencies and the 17.5-hour limit for retirees. They discussed catch basin cleaning metrics, noting 3-1-1 tickets and data reporting gaps with cartograph systems, and the team explained immediate actions after July 11th including catch basin cleaning on Claiborne Avenue and Lakeview areas. The board acknowledged the need for real-time pump status alerts and better communication with the council and residents, including potential staffing increases. They also addressed the possibility of screens on catch basins and the importance of punch-list items for construction debris removal from catch basins after road projects.

Reliability Resolution Amendment — Feeder-Level Reporting

Council Member Willard

Be it further resolved by the Council of the City of New Orleans that E&O is directed to include a feeder level analysis using the original methodology as described in Appendix A of Resolution Number R2373, as well as the adjusted methodology E&O proposed in its 2024 ESDRS filing. Additionally, E&O is directed to record and report portfolio and feeder level SADI and SAFE, including major event days in its annual compliance filing. E&O is directed to resubmit its 2025 reliability report with this information and to include this information in future reliability reports.

Electric Formula Rate Plan Rider Extension — Resolution

Council Member Willard

This resolution is to consider Entergy's motion regarding an extension of the electric formula rate plan rider. It's a procedural schedule.